Predictive Maintenance & Multi-Year Budget Allocation

Traffic Load vs. Road Age Degradation Scatter Model • Preventative Cost Optimization

PREDICTION HORIZON & CLIMATIC WHAT-IF SIMULATOR
Forecast Horizon:
Monsoon Intensity Multiplier:1.2x Rainfall
1.0x (Normal)1.5x (Above Average)2.5x (Flash Flood Stress)
Heavy Commercial Axle Load Growth:+10% Traffic
+0% (Current MSA)+20% (Urban Expansion)+40% (Freight Corridor)

Traffic Volume vs. Pavement Age Scatter Matrix (12-Month Forecast)

Bubble size represents Distress Risk Index. Click any bubble or table row to inspect recommended treatment.

Critical (<30 days) Warning (30-90 days) Low Risk (>90 days)
Road SegmentWardRiskDays to FailureFix NowFix LaterActions
Outer Ring Road (IIT Flyover)Ward 12 - South DelhiCritical11 days₹5.8L₹42.2L
Barakhamba Road ArterialWard 34 - NDMCCritical17 days₹4.2L₹32.3L
NH-48 Mahipalpur StretchWard 14 - Airport ZoneWarning34 days₹6.2L₹46.2L
Connaught Place Outer CircleWard 34 - NDMCWarning44 days₹3.4L₹24L
Janpath AvenueWard 33 - NDMCLow136 days₹1.4L₹11.2L
Dwarka Expressway Sec 21Ward 08 - DwarkaLow182 days₹1.8L₹12.9L

Preventative Budget Allocation (12-Month Forecast)

AI Recommendation Engine • Computed from 4 at-risk segments

Save 7.4x Budget
Option A: Preventative Patching Now (Next 12 Months)
₹19.6 Lakhs

Full-depth micro-patching of all at-risk segments before monsoon moisture infiltration.

Extends pavement life by 4+ years
Option B: Deferred Full Reconstruction (After Failure)
₹144.7 Lakhs

Complete sub-base milling, DBM overlay, traffic diversion costs, and emergency contractor tenders.

Causes 7.4x higher municipal budget strain